Stop 14 · Build Your Cloud PortfolioProjects · 5/7

Cost-Optimized Migration Case Study

Part of the Cloud Computing Roadmap

In short

Companies don't move to the cloud for fun. They want it cheaper, faster or safer. A case study that shows a before-and-after bill, with each saving explained, speaks the language managers care about.

A written case study (real or hypothetical) walking through migrating a legacy application to the cloud with a specific focus on cost — before/after cost comparison and the specific optimizations applied.

The blob character compares two plates of food at a table with a notebook and calculator.

Think of it like this

The mess committee's report

When the hostel switches mess contractors, the committee writes a report. Old cost per plate, new cost per plate, what changed in the menu, and why the new one saves money without making the dal watery. Everyone can check the numbers.

Watch it happen

Structure of a strong case study

Baseline
Design
Migrate
Optimise
Compare
Lessons

1/6Describe the old setup and its monthly cost: servers, licences, power, people time. Say clearly if numbers are estimated.

The big ideas

What you need to know

Real or clearly hypothetical

A made-up company is fine. Just label it hypothetical and use real pricing calculator numbers.

Right-size first

Old servers are often oversized for peak. Matching cloud sizes to real usage is usually the biggest saving.

Turn off what sleeps

Dev and test environments that stop at night and on weekends can cut their cost sharply.

Commit only after measuring

Savings Plans or reserved instances cut prices for steady workloads. Buy them after usage is stable, not on day one.

See it in code

Walk through the code

bash
1# Monthly cost by service, for your before/after table2aws ce get-cost-and-usage \3  --time-period Start=2026-09-01,End=2026-10-01 \4  --granularity MONTHLY \5  --metrics UnblendedCost \6  --group-by Type=DIMENSION,Key=SERVICE \7  --query "ResultsByTime[0].Groups[].[Keys[0],Metrics.UnblendedCost.Amount]" \8  --output table

1/3One full month of data. The end date is exclusive.

If you ran the migration in your own account, pull real numbers with Cost Explorer. Each API call has a small charge, so don't loop it.

Save yourself the pain

Common mistakes

Oops

Comparing only server prices and forgetting data transfer, backups and support.

Do this instead

Include every line on both sides, including egress and on-premises power, space and staff time.

Oops

Claiming huge savings with no workings shown.

Do this instead

Show each number's source: calculator link, bill export or a clearly stated assumption.

Your mission

First milestone: the baseline

~40 min

Quick check

When should a team buy a 1-year commitment like a Savings Plan after migrating?

Go deeper

  1. 1Frame a realistic legacy scenario (on-premise or poorly-optimized cloud) as your starting point.
  2. 2Apply the 6 Rs framework (Phase 13) to justify your migration approach.
  3. 3Show a clear before/after cost estimate with the specific levers (right-sizing, storage tiers, reserved pricing) you used.