Stop 14 · Build Your Business Analyst PortfolioProjects · 1/7

End-to-End Requirements Case Study

Part of the Business Analyst Roadmap

In short

This is the piece hiring managers open first. One problem, taken from 'what's wrong?' to a signed-off requirements document, shows you can do the whole BA job, not just parts of it.

The flagship portfolio piece — take a real or realistic problem through the full arc from elicitation to a complete BRD/FRD, showing your full requirements process end to end.

The purple blob holds a clipboard in front of a half-decorated wedding stage with marigold garlands.

Think of it like this

Planning a family wedding

A wedding planner starts with what the family wants, sorts the must-haves from the wishes, writes a detailed plan for caterers and decorators, then checks everything on the day. Your case study walks the same arc for a business problem.

Watch it happen

Your build plan, start to finish

Problem
Elicit
Analyse
Document
Validate

1/5Pick a realistic problem, like a college canteen with long lunch queues. Write a one-paragraph problem statement and goal.

The big ideas

What you need to know

A clear problem and goal

Open with the pain, who feels it and how you'll measure success. Everything else should trace back to this.

Real elicitation evidence

Include interview questions, notes and a survey summary. It proves you talked to people, not just imagined them.

A complete requirements document

Scope, in and out. Functional and non-functional requirements. Stories with acceptance criteria. Assumptions and open questions.

Traceability

A simple matrix linking each requirement to a business goal and a test shows real BA discipline.

See it in code

Walk through the code

text
1ID     | Requirement                    | Goal | Source       | Test2FR-01  | Student can pre-order by 11:00 | G1   | Interview 2  | TC-013FR-02  | Pay by UPI before confirming   | G1   | Manager      | TC-024FR-03  | Staff see orders by pickup slot| G2   | Staff shadow | TC-035NFR-01 | Order page loads in < 3 sec    | G1   | Survey       | TC-04

1/3Columns: what, why, where from, and how you'll prove it works.

A slice of a requirements traceability matrix. Every row links a requirement to a goal, where it came from, and how it will be tested.

Save yourself the pain

Common mistakes

Oops

Inventing all the stakeholder input in your head.

Do this instead

Talk to a few real people, even friends who use the system. Real quotes make the case study believable.

Oops

Submitting a 40-page document with no summary.

Do this instead

Add a one-page overview at the front: problem, approach, key requirements and outcome.

Your mission

Milestone 1: problem and plan

~45 min

Quick check

Why include a traceability matrix in this case study?

Go deeper

  1. 1Extend your Phase 3 BRD practice project into a fuller case study with elicitation notes.
  2. 2Include your elicitation approach, key requirements, and how you validated them.
  3. 3Present it as a narrative: problem, process, outcome, not just a static document.

More projects at this stop

Stuck on this topic? Ask an Insider

Get 1:1 guidance from people who've walked this exact path — on the InsideEdge app.

Download
InsideEdge